Las Vegas, Nevada (Official City of Las Vegas Text Site)
 
Home | Visitor | Resident | Business
Translate/Traduzca/Traduisez... |

Check Status of Roadwork and Traffic

The Department of Public Works reports that the following streets may be closed or disrupted and have a City approved barricade plan to perform the work: these dates may or may not, necessarily, be completion dates for the projects.

  Street Location Start Date End Date Issue
Street Closure 215 East Ramp At Durango Dr 11/2/2014 11/7/2014 Bridge Construction
Street Closure 215 West Ramp At Durango Dr 10/26/2014 10/31/2014 Bridge Construction
Street Closure Downtown Area Las Vegas Blvd-10th St-Carson Ave-Mesquite Ave 10/22/2014 10/29/2014 Life Is Beautiful Festival
Street Closure F Street Between City Center Pkwy & Mc Williams Ave 9/17/2014 12/31/2014
Street Closure Fort Apache Drive At Deer Springs 10/9/2014 2/28/2015 Bridge Construction
Street Disruption Alexander Road At Torrey Pines Dr 7/7/2014 11/27/2014 Signal Install
Street Disruption Alexander Road At Cimarron Rd (Signal Install 7/25/2014 8/25/2014 Signal Install
Alta Drive Between Hualapai Wy & CC-215 Landscaping (indefinite)
Street Disruption Anasazi Drive Between Lake Mead Blvd & Town Center Dr Landscaping Maintenance (Indefinite)
Street Disruption Ann Road At Torrey Pines Dr 7/7/2014 11/27/2014 Signal Install
Street Disruption Ann Road At Cimarron Rd 7/7/2014 11/27/2014 Signal Install
Street Disruption Azure Drive W of Tenaya Way 10/6/2014 10/30/2014 Power Install
Street Disruption Bonanza Road At Page St 7/7/2014 11/27/2014 Signal Install
Street Disruption Bridger Avenue Between Main St & 6th St 9/25/2014 12/31/2014 Street Rehab
Street Disruption Canyon Run Drive Between Town Center Dr & Rampart Blvd Landscaping (Indefinite)
Casino Center Boulevard At Lewis Ave 10/6/2014 10/30/2014 Scaffolding
Street Disruption Centennial Parkway At Grand Montecito Pkwy 7/7/2014 11/27/2014 Signal Install
Street Disruption Charleston Boulevard At Montclair St 10/20/2014 11/16/2014 Abandon & Install Water
Street Disruption Charleston Boulevard Between Cimarron Rd & Warbonnet Way 7/17/2014 11/21/2014 Sewer
Street Disruption Deer Springs Way At Durango Dr 10/9/2014 11/9/2014 Underground Utilities
Street Disruption Deer Springs Way Between Hualapai Wy & Grand Canyon Dr 10/9/2014 10/31/2014 Paving
Street Disruption Durango Drive Between Grand Montecito Pkwy & Riley St 9/26/2014 11/16/2014 Water Valve
Street Disruption Far Hills Avenue Between Anasazi Dr & CC215 Landscaping - Indefinite
Street Disruption Grand Montecito Parkway At Centennial Pkwy 10/7/2014 11/6/2014 Potholing
Street Disruption Hills Center Drive Between Village Center Cir & Lake Mead Blvd Landscaping (Indefinite)
Street Disruption Hualapai Way Between Charleston Blvd & Town Center Dr Landscaping (Indefinite)
Street Disruption Hualapai Way Anasazi Dr & Town Center Dr Landscaping (Indefinite)
Lake Mead Boulevard Between Anasazi Dr & Town Center Dr Landscaping Maintenance
Street Disruption Lamb Boulevard At Owens Ave 7/7/2014 11/27/2014 Signal Install
Street Disruption Main Street Between Ogden Ave & Charleston Blvd 8/15/2014 4/30/2015 Underground Utilities
Street Disruption Main Street At Stewart Ave 7/7/2014 1/2/2015 Main St Station Maintenance
Street Disruption Martin L King Boulevard Between Bonanza Rd & Mineral Ave 10/13/2014 11/8/2014 Paving
Street Disruption Martin L King Boulevard Between US95 & Costco 10/20/2014 11/16/2014 Water & Sewer Install
Street Disruption Ogden Avenue Between 6th St & 7th St 7/7/2014 11/27/2014 Signal Install
Street Disruption Ogden Avenue Between Main St & 1st St 7/7/2014 1/2/2015 California Hotel Sign Maintenance
Racel Street Between Grazing Grass St & El Capitan Wy 6/3/2014 10/28/2014 (Storm Drain)
Street Disruption Racel Street At Coke St 10/7/2014 11/6/2014 Potholing
Streep Disruption Rampart Boulevard Between Lake Mead Blvd & Summerlin Pkwy 10/9/2014 2/28/2015 Water & Sewer
Street Disruption Rampart Boulevard at Cheyenne Ave Landscaping (Indefinite)
Street Disruption Sky Pointe Drive At Cimarron Rd 7/7/2014 11/27/2014 Signal Install
Street Disruption Stewart Avenue At 3rd St 7/7/2014 11/27/2014 Signal Install
Street Disruption Town Center Drive Between Charleston Blvd & Summerlin Pkwy Landscaping (Indefinite)
Street Disruption Town Center Drive Between Summerlin Pkwy & Village Center Circle Landscaping (Indefinite)
Street Distruption Vegas Drive Between Rampart Blvd & Buffalo Dr Landscaping (Indefinite)
Street Disruption Washington Avenue At Sandhill Ave 7/7/2014 11/27/2014 Signal Install
Street Disruption Washington Avenue Between Saylor Wy & Ridgemont Dr 10/9/2014 11/8/2014 Tree Trimming

Contact Information
Traffic Engineering Division
Public Works Department
333 N. Rancho Drive
Las Vegas, NV 89106 (Map)
Phone: (702) 229-6327
Fax: (702) 366-0032


Business Hours: Monday to Thursday 7 a.m. to 5:30 p.m., CLOSED Friday

 

^ External Link
© 2010 City of Las Vegas | Privacy, Security, Acceptable Use Policies | Accessibility | About This Web Site | Contact Us