|
Offsite Inspection & Testing (OIT) All files below are in PDF format Procedure No. 101 - Submittal of Construction Phase Reports Procedure No. 102 - Type III Pipe Zone Backfill Material Report Procedure No. 103 - Utility Trench Backfill Material Report Procedure No. 104 - Trench Backfill Operation Report Procedure No. 105 - Pavement Section Design Verification Report Procedure No. 106 - Native Soil In-Lieu of (NILO) Imported Sub-base Aggregate Report Procedure No. 107 - Offsite Grading Report Procedure No. 108 - Materials Qualification - Aggregate Base (IQAC) Procedure No. 109 - Materials Qualification - Aggregate Base (with RAP)
|
Contact Information
Offsite Inspection & Testing (OIT) |