Assembly Group: Theaters (Plays) Complete
|
Theatres, auditoriums, etc. Typically includes fixed seating intended
for the production and viewing of the performing arts or motion pictures.
Does not include restaurants, lounges, night clubs, casinos etc.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Assembly Group: Theaters - TI
|
TI Permit for Theatres, auditoriums, etc. Typically includes fixed
seating intended for the production and viewing of the performing arts or
motion pictures. Does not include restaurants, lounges, night clubs,
casinos etc. A tenant improvement is the initial interior completion of a
space or renovation of an existing space.
|
Assembly Group: Casino/Banquet Hall - Complete
|
Casino is a business with a non-restricted Gaming License from the
Nevada Gaming Commission and State Gaming Control Board. More than 15
gaming machines or includes table games. Less than 15 gaming machines and
no table games will be considered a tavern, bar, or lounge permit.
Assembly uses intended for premises consumption of food and drink and
may also include Banquet Halls.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Assembly Group: Casino/Banquet Hall TI
|
TI Permit for a Casino or Banquet Hall. A tenant improvement is the
initial interior completion of a space or renovation of an existing
space.
|
Assembly Group: Nightclub / Restaurant - Complete
|
Assembly uses intended for premises consumption of food and drink and
may include nightclubs, restaurants, lounges, bars, taverns, sandwich
shops, pizza shops, yogurt shops.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Assembly Group: Nightclub / Restaurant - TI
|
TI Permit for a Nightclub/Restaurant. A tenant improvement is the
initial interior completion of a space or renovation of an existing
space.
|
Restaurant (<50 occ.) - Complete
|
Includes lounges, bars taverns, sandwich shops, pizza shops, etc. There
is not a minimum size requirement. Does not include food processing
plants, take out only stores, etc.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Restaurant (<50 occ.) - TI
|
TI Permit for a Restaurant. A tenant improvement is the initial
interior completion of a space or renovation of an existing
space.
|
Offices, etc. - Complete
|
Architecture, engineering, legal and other professional offices.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Offices, etc. - Expanded
Shell
|
Architecture, engineering, legal and other professional offices.
An expanded shell building is a structure which does not include all
the elements necessary to create an occupiable structure. An expanded
shell building may include more than four walls and a roof, however is not
a complete building. An expanded shell building requires all the exterior
work on the site to be completed. An expanded shell building does not
receive a Certificate of Occupancy, however they do receive a final.
Expanded shell permits are allowed on retail and professional office
buildings only.
|
Offices, etc. - TI
|
TI Permit for Architecture, engineering, legal and other professional
offices. A tenant improvement is the initial interior completion of a
space or renovation of an existing space.
|
Medical Offices - Complete
|
Doctor, dental, physical therapy offices.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Medical Offices - TI
|
TI Permit for Doctor, dental, physical therapy offices. A tenant
improvement is the initial interior completion of a space or renovation of
an existing space.
|
Offices - Highrise - Complete
|
Architecture, engineering, legal and other professional offices. Office
buildings with occupied floor located more than 55 feet above the lowest
level of the fire department vehicle access.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Offices - Highrise - TI
|
TI Permit for architecture, engineering, legal and other professional
offices. Office buildings with occupied floor located more than 55 feet
above the lowest level of the fire department vehicle access. . A tenant
improvement is the initial interior completion of a space or renovation of
an existing space.
|
Highrise: All types - Foundation
|
Foundation only for buildings with occupied floor located more than 55
feet above the lowest level of the fire department vehicle access.
Foundation only for a commercial building. Includes foundations, piers
and caissons, below grade basement walls, slab on grade and utility work
below the slab on grade. Foundation permits do not include elevated slabs.
Based on the total area of the building including all floors.
|
Highrise: All types - Superstructure
|
Buildings with occupied floor located more than 55 feet above the
lowest level of the fire department vehicle access.
|
Highrise: All types - TI
|
TI Permit for Buildings with occupied floor located more than 55 feet
above the lowest level of the fire department vehicle access. A tenant
improvement is the initial interior completion of a space or renovation of
an existing space.
|
Assembly Group - Halls - Complete
|
Assembly uses intended for workship, recreation or amusement and other
assembly uses not classified elsewhere.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Assembly Group - Halls - TI
|
TI Permit for Assembly buildings that are simpler in nature. A tenant
improvement is the initial interior completion of a space or renovation of
an existing space.
|
Assembly Group - Exhibition - Complete
|
Assembly uses intended for workship, recreation or amusement and other
assembly uses not classified elsewhere.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Assembly Group - Exhibition - TI
|
TI Permit for Assembly buildings that are simpler in nature. A tenant
improvement is the initial interior completion of a space or renovation of
an existing space.
|
Assembly Group - Recreation - Complete
|
Assembly uses intended for workship, recreation or amusement and other
assembly uses not classified elsewhere.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Assembly Group - Recreation - TI
|
TI Permit for Assembly buildings that are simpler in nature. A tenant
improvement is the initial interior completion of a space or renovation of
an existing space.
|
Educational Building - Complete
|
Six or more persons at any one time for educational purposes, K-12,
public and/or private. Does not include ages other than K through 12 such
as day care, adult education, etc.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Educational Building - TI
|
TI Permit for K-12, public and/or private buildings. A tenant
improvement is the initial interior completion of a space or renovation of
an existing space.
|
Factory/Industrial - Complete
|
Factory Industrial Group includes the use of a building or structure,
or a portion thereof, for assembling, disassembling, fabricating,
finishing, manufacturing, packaging, repair or processing operations that
are not classified as a Group H hazardous or Group S storage.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Factory/Industrial - TI
|
TI Permit for Factory Industrial Group (includes the use of a building
or structure, or a portion thereof, for assembling, disassembling,
fabricating, finishing, manufacturing, packaging or repair). A tenant
improvement is the initial interior completion of a space or renovation of
an existing space.
|
Hazardous - H - Complete
|
High-Hazard Group H occupany includes the use of a building or
structure, or portion thereof, that involves the manufacturing,
processing, generation or storage of materials that constitute a physical
or health hazard in quantities in excess of those allowed in control
areas.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Hazardous - H - TI
|
TI Permit for High-Hazard Group H occupany. A tenant improvement is the
initial interior completion of a space or renovation of an existing
space.
|
Single-Family (custom or residential)
|
Residential occupancies where the occupants are primarily permanent in
nature and not classified as Group R-1, R-2 or R-4. Custom homes or Model
homes.
|
Single-Family - Production/Repeat
|
A single family home, based on previously approved plans for that
subdivision. Production homes may only be submitted after a Final Map has
recorded.
|
Single-Family Residential - Addition
|
Additional living space added to an existing single family dwelling
unit. The additional area may be added by converting non-livable space
such as a garage or patio cover, as well as a new structure.
|
Single-Family Residential - Remodel with MPE's
|
Reconfiguration or repair of existing livable space with Mechanical,
Electrical and Plumbing work. If new livable space is added, an addition
permit is required.
|
Single-Family Residential - Remodel without MPE's
|
Reconfiguration or repair of existing livable space - No Mechanical,
Electrical and Plumbing work. If new livable space is added, an addition
permit is required.
|
Hotel: Low/Midrise - Complete
|
Residential occupancies containing sleeping units where the occupants
are primarily transient in nature. Buildings with occupied floor located
less than 55 feet above the lowest level of the fire department vehicle
access.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Hotel: Low/Midrise - TI/Remodel
|
TI/Remodel Permit for Residential occupancies containing sleeping units
where the occupants are primarily transient in nature. A tenant
improvement is the initial interior completion of a space or renovation of
an existing space.
Buildings with occupied floor located less than 55 feet above the
lowest level of the fire department vehicle access.
|
Hotel: Highrise - Complete
|
Residential occupancies containing sleeping units where the occupants
are primarily transient in nature. Buildings with occupied floor located
more than 55 feet above the lowest level of the fire department vehicle
access.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Hotel: Highrise - TI/Remodel
|
TI Permit for Residential occupancies containing sleeping units where
the occupants are primarily transient in nature. A tenant improvement is
the initial interior completion of a space or renovation of an existing
space.
Buildings with occupied floor located more than 55 feet above the
lowest level of the fire department vehicle access.
|
Apartment/Condo: Low/Midrise - Complete
|
Residential occupancies containing sleeping units or more than two
dwelling unit where the occupants are primarily permanent in nature.
Buildings with occupied floor located less than 55 feet above the lowest
level of the fire department vehicle access.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Apartment/Condo: Low/Midrise - TI/Remodel
|
TI Permit for Residential occupancies containing sleeping units or more
than two dwelling unit where the occupants are primarily permanent in
nature. A tenant improvement is the initial interior completion of a space
or renovation of an existing space. Buildings with occupied floor located
less than 55 feet above the lowest level of the fire department vehicle
access.
|
Apartment/Condo: Low/Midrise - Addition
|
Residential occupancies containing sleeping units or more than two
dwelling unit where the occupants are primarily permanent in nature. An
addition to the original structure.
Buildings with occupied floor located less than 55 feet above the
lowest level of the fire department vehicle access.
|
Apartment/Condo: Highrise - Complete
|
Residential occupancies containing sleeping units or more than two
dwelling unit where the occupants are primarily permanent in nature.
Buildings with occupied floor located more than 55 feet above the lowest
level of the fire department vehicle access.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Apartment/Condo: Highrise - TI/Remodel
|
TI Permit for Residential occupancies containing sleeping units or more
than two dwelling unit where the occupants are primarily permanent in
nature. A tenant improvement is the initial interior completion of a space
or renovation of an existing space. Buildings with occupied floor located
more than 55 feet above the lowest level of the fire department vehicle
access.
|
Residential Care - Complete
|
Includes buildings or structures housing more than 16 persons, on a
24-hour basis, who because of age, mental disability or other reasons,
live in a supervised residential environment that provides personal care
services.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Residential Care - TI
|
TI Permit for Residential Care facilities housing more than 16
people.
A tenant improvement is the initial interior completion of a space or
renovation of an existing space.
|
Hospitals/Nursing Homes - Complete
|
Buildings used for medical, surgical, psychiatric, nursing or custodial
care for persons who are not capale of self-preservation.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Hospitals/Nursing Homes - TI
|
TI Permit for buildings used for medical, surgical, psychiatric,
nursing or custodial care for persons who are not capale of
self-preservation.
A tenant improvement is the initial interior completion of a space or
renovation of an existing space.
|
Child Care (24-hr, >5 kids <2.5 yrs) - Complete
|
Facilities that provide care on a s 24-hour basis to more than five
children, 2 1/2 years of age or less.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Child Care (24-hr, >5 kids <2.5 yrs) - TI
|
TI Permit for buildings used for a 24-hour basis to more than five
children, 2 1/2 years of age or less.
A tenant improvement is the initial interior completion of a space or
renovation of an existing space.
|
Detention Facilities - Complete
|
This occupancy shall include buildings and structures that are
inhabited by more than five persons who are under restraint or
security.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Detention Facilities - TI
|
TI Permit for buildings and structures that are inhabited by more than
five persons who are under restraint or security.
A tenant improvement is the initial interior completion of a space or
renovation of an existing space.
|
Day Care Facility - Complete
|
Buildings and structures occupied by persons of any age who receive
custodial care for less than 24 hours by individuals other than parents or
guardians, relatives by blood, marriage or adoption and in a place other
than the home of the person cared for. A facility such as the above with
five or fewer persons shall be classified as a Group R-3.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Day Care Facility - TI
|
TI Permit for Buildings and structures occupied by persons of any age
who receive custodial care for less than 24 hours by individuals other
than parents or guardians, relatives by blood, marriage or adoption and in
a place other than the home of the person cared for. A facility such as
the above with five or fewer persons shall be classified as a Group
R-3.
A tenant improvement is the initial interior completion of a space or
renovation of an existing space.
|
Storage (Combustable - not S-2) - Complete
|
Buildings occupied for storage uses that are not classified as Group
S-2 (low-hazard). Complete structures contain all the elements necessary
to create a legally occupiable building. All complete buildings will
receive a Certificate of Occupancy.
|
Storage (Combustable - not S-2) - TI
|
TI Permit for Buildings occupied for storage uses that are not
classified as Group S-2 (low-hazard). A tenant improvement is the initial
interior completion of a space or renovation of an existing
space.
|
Repair Garage / Service Station - Complete
|
Buildings occupied for storage uses that are not classified as Group
S-2 (low-hazard). Motor Vehicle repair garages complying with the maximum
allowable quantities of hazardous materials listed in Table 307.1 of the
International Building Code
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Repair Garage / Service Station - TI
|
TI Permit for Motor Vehicle repair garages complying with the maximum
allowable quantities of hazardous materials listed in Table 307.1 of the
International Building Code. A tenant improvement is the initial interior
completion of a space or renovation of an existing space.
|
Storage (Non-Combustable - not S-1) - Complete
|
S-2 is for low hazard storage which includes, among others, buildings
used for storage of noncombustible materials such as product on wood
pallets or in paper cartons with or without single thickness divisions; or
in paper wrappings. Such products are permitted to have a negligible
amount of plastic trim, such as knobs, handles or film wrapping.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Storage (Non-Combustable - not S-1) - TI
|
TI Permit for S-2 is for low hazard storage . A tenant improvement is
the initial interior completion of a space or renovation of an existing
space.
|
Parking Garage - Complete
|
Parking garages, open or enclosed are part of the S-2 low hazard
storage category.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Utility Structure (without MPE's)
|
Buildings and structures of an accessory character and miscellaneous
structures not classified in any specific occupancy shall be constructed,
equipped and maintained to conform to the requirements of the
International Building Code commensurate with the fire and life hazard
incidental to their occupancy. This is a Utility Structure without
Mechanical, Plumbing and Electrical work.
|
Utility Structure (with MPE's)
|
Buildings and structures of an accessory character and miscellaneous
structures not classified in any specific occupancy shall be constructed,
equipped and maintained to conform to the requirements of the
International Building Code commensurate with the fire and life hazard
incidental to their occupancy. This is a Utility Structure with
Mechanical, Plumbing and Electrical work included.
|
Mercantile / Store - Complete
|
Mercantile Group M occupancy includes, among others, the use of a
building or structure or a portion thereof, for the display and sale of
merchandise and involves stocks of goods, wares or merchandise incidental
to such purposes and accessible to the public.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Mercantile / Store - Expanded
Shell
|
Mercantile Group M occupancy includes, among others, the use of a
building or structure or a portion thereof, for the display and sale of
merchandise and involves stocks of goods, wares or merchandise incidental
to such purposes and accessible to the public.
An expanded shell building is a structure which does not include all
the elements necessary to create an occupiable structure. An expanded
shell building may include more than four walls and a roof, however is not
a complete building. An expanded shell building requires all the exterior
work on the site to be completed. An expanded shell building does not
receive a Certificate of Occupancy, however they do receive a final.
Expanded shell permits are allowed on retail and professional office
buildings only.
|
Mercantile / Store - TI
|
TI Permit for Mercantile Group M occupancy includes the use of a
building or structure or a portion thereof, for the display and sale of
merchandise and involves stocks of goods, wares or merchandise incidental
to such purposes and accessible to the public. A tenant improvement is the
initial interior completion of a space or renovation of an existing
space.
|
Mercantile / Store: Highrise - Complete
|
Mercantile Group M occupancy includes, among others, the use of a
building or structure or a portion thereof, for the display and sale of
merchandise and involves stocks of goods, wares or merchandise incidental
to such purposes and accessible to the public. Buildings with occupied
floor located more than 55 feet above the lowest level of the fire
department vehicle access.
Complete structures contain all the elements necessary to create a
legally occupiable building. All complete buildings will receive a
Certificate of Occupancy.
|
Mercantile / Store: Highrise - TI
(tier 1)
|
TI Permit for Mercantile Group M occupancy includes the use of a
building or structure or a portion thereof, for the display and sale of
merchandise and involves stocks of goods, wares or merchandise incidental
to such purposes and accessible to the public. A tenant improvement is the
initial interior completion of a space or renovation of an existing
space.
Buildings with occupied floor located more than 55 feet above the
lowest level of the fire department vehicle access.
|
Mercantile / Store: Highrise - TI
(tier 2)
|
TI Permit for Mercantile Group M occupancy includes the use of a
building or structure or a portion thereof, for the display and sale of
merchandise and involves stocks of goods, wares or merchandise incidental
to such purposes and accessible to the public. A tenant improvement is the
initial interior completion of a space or renovation of an existing
space.
Buildings with occupied floor located more than 55 feet above the
lowest level of the fire department vehicle access.
|
Mercantile / Store: Non-Highrise - TI
(tier 2)
|
TI Permit for Mercantile Group M occupancy includes the use of a
building or structure or a portion thereof, for the display and sale of
merchandise and involves stocks of goods, wares or merchandise incidental
to such purposes and accessible to the public. A tenant improvement is the
initial interior completion of a space or renovation of an existing
space.
Buildings with occupied floor located less than 55 feet above the
lowest level of the fire department vehicle access.
|
Arena
|
Assembly uses intended for viewing of indoor sporting events and
activities with spectator seating including but not limited to: Arenas,
Skating rinks, Swimming Pools and Tennis Courts.
|
Standard
Shell
- Highrise
|
A shell building is a structure which does not include all the elements
necessary to create an occupiable structure. A shell building is basically
four walls and a roof. A shell building requires all the exterior work on
the site to be completed. A shell building does not receive a Certificate
of Occupancy, however they do receive a final. Warehouse and storage
buildings are not allowed as shell buildings.
Buildings with occupied floor located more than 55 feet above the
lowest level of the fire department vehicle access.
|
Standard
Shell
- Non-Highrise
|
A shell building is a structure which does not include all the elements
necessary to create an occupiable structure. A shell building is basically
four walls and a roof. A shell building requires all the exterior work on
the site to be completed. A shell building does not receive a Certificate
of Occupancy, however they do receive a final. Warehouse and storage
buildings are not allowed as shell buildings.
Buildings with occupied floor located more than 55 feet above the
lowest level of the fire department vehicle
access.
|